Finished marble cold plunge at Bulgari Residences

The brief: make a completed luxury cold plunge cool properly, remove unsafe temporary power and make future service possible without demolition.

The starting point

At Bulgari Residences, cooling took nearly a full day. The equipment was powered through extension leads, and removing the chiller required cutting pipework. Maintenance could not be performed without disturbing the finished installation.

What Euphorium changed

The result

The marble feature remained in place while the operating system behind it became faster, safer and serviceable. Future diagnosis and maintenance no longer begin by damaging the finished room.

What this case proves

A luxury finish and a maintainable technical system are not competing goals. The service route, electrical protection and removable connections need to be designed with the cooling system, not added after a failure.